Roads, Roadworks & Traffic


Phased Closures of Lower Stoke and Woods Hill

January 2nd 2024 until May 24th 2024

Wales & West Utilities are carrying out a gas mains upgrade on Lower Stoke. The work began on 2nd January 2024 and phased closures will take place over a 5 month period until 24th May 2024. These works will undoubtedly lead to some disruption although access will be maintained for residents and businesses where possible.

Phase 1: January 2nd to January 26th
Lower Stoke (B3108) between Winsley Hill and Woods Hill junctions

Phase 2: January 27th to March 8th
From Woods Hill junction to 7 Crowe Hill

Phase 3: March 9th to April 19th
From 7 Crowe Hill to junction with Cliffe Drive

Phase 4: April 22nd to May 24th
Woods Hill

Details on the closures can be found on the following links:
Information Sheet outlining the phasing of the works
Notice of phasing and alternative routes
https://one.network/?tm=135383213
https://one.network/?GB136881636

Issues with our roads

Where to report a complaint

Do you have a concern about our local roads and lanes?

If so, please contact Wiltshire Council directly at https://www.wiltshire.gov.uk/mywilts-online-reporting

An additional or alternative website for reporting problems is https://www.fixmystreet.com/

Long Term Plans & Initiatives

As a parish council we know that the roads, pedestrian safety and traffic in general has long been a priority issue for many residents, we therefore have five themes to our consideration of this issue and work to address these is ongoing: